From City of Chicago building permits · 2025-01 to 2026-11
What a new roof costs in Chicago, from 927 real permits
Every roof replacement in Chicago needs a city permit, and the permit lists the roof area, the material and the job cost. For an asphalt shingle roof the median was $17,250; half of all jobs fell between $11,850 and $25,300. Put in your quote to see where it lands.
Want a second look before you sign?
Forward the quote (PDF, photo or the contractor's email) to
We reply by email with where it ranks among Chicago permits of the same size and type, and which of the items below it doesn't spell out. Free while we test this. Add your ZIP code and the number of layers coming off if you know them.
Asphalt shingle roofs: cost by roof size
| Roof area | Permits | Low end (25th pct) | Median | High end (75th pct) |
|---|---|---|---|---|
| 800–1,200 sq ft | 82 | $8,000 | $12,650 | $22,950 |
| 1,200–1,600 sq ft | 146 | $9,900 | $13,200 | $20,500 |
| 1,600–2,000 sq ft | 153 | $12,750 | $16,750 | $25,750 |
| 2,000–2,500 sq ft | 148 | $14,750 | $18,650 | $25,600 |
| 2,500–3,000 sq ft | 58 | $17,900 | $21,000 | $27,850 |
| 3,000–4,000 sq ft | 22 | $20,400 | $26,600 | $36,100 |
609 replacement permits, 800–4,000 sq ft, asphalt shingles, issued 2025-01-08 to 2026-11-15. Per square foot: median $9.13, middle half $6.96–$13.64.
Flat roofs: cost by roof size
| Roof area | Permits | Low end (25th pct) | Median | High end (75th pct) |
|---|---|---|---|---|
| 800–1,200 sq ft | 54 | $14,000 | $20,400 | $28,800 |
| 1,200–1,600 sq ft | 81 | $17,000 | $25,000 | $32,000 |
| 1,600–2,000 sq ft | 53 | $20,000 | $30,000 | $35,000 |
| 2,000–2,500 sq ft | 51 | $19,300 | $30,700 | $43,750 |
318 replacement permits for built-up and mineral-surfaced rolled roofs, 800–4,000 sq ft. Many are two-flats and small apartment buildings, so the spread is wider than for shingles; above 2,500 sq ft it is too wide to be useful, so those rows are left out.
What a complete roof quote spells out
Two quotes can differ by $8,000 because one includes work the other leaves for later. Check that yours names each of these:
- Tear-off: how many layers come off. More layers, more labor and dumpster weight.
- Decking: a price per sheet of rotted plywood and how many sheets are included. This is the most common surprise charge after the old roof is off.
- Underlayment and ice barrier: what goes under the shingles, and whether ice-and-water membrane runs along the eaves and valleys.
- Flashing and vents: whether chimney, wall and pipe flashing is replaced or reused, and what ventilation is added.
- Permit and license: that the contractor pulls the city permit and lists an Illinois roofing license number (every permit above shows one).
- Warranty: the shingle maker's warranty and, separately, how many years the contractor covers their own workmanship.
How to read these numbers
The cost is what the contractor wrote on the permit application. The city doesn't audit it and permit fees depend on it, so some jobs are reported low. Treat a quote near the median as normal and one far above the pricier quarter as a reason to ask what's included. Jobs whose permit also covers siding, windows, gutters, decks, solar or interior work are excluded.
Source: City of Chicago Building Permits open data, downloaded November 2026. We only count permits whose description gives a scope of "roof replacement", a roof area and a roof covering. No addresses or owner names are used on this page.